The Design and Building Permit Process: Stages, Documents and Coordination
Behind every designed house or space lies a sequence of decisions, coordination and approvals. Knowing the stages helps build a realistic timeline and understand what is required at each stage. This is what the design process guided by Sandbank Architects looks like, from the first meeting to the work on site.

1. Introduction and brief
The process begins with getting to know the residents or the client: the needs, the way of life or the nature of the activity, the budget framework and the timeline. On this basis, the scope of work is defined.
2. Site and planning information review
Before starting to draw, the data that determine what can be built are checked: the plans that apply to the site, the building rights, the building lines and the permitted height. An up-to-date survey map and planning information from the local authority are the basis for all further work.
3. Preliminary design and alternatives
At this stage, alternatives are studied for the layout of the building, the division of spaces and the connection to the outside. The decisions made here affect everything that follows.
4. Building permit application
Once the design takes shape, the permit application is prepared and submitted to the local planning and building committee, today through the Rishui Zamin online licensing system. The application includes drawings, area calculations and supporting documents, and sometimes approvals from other authorities. Not all work requires a permit: some works are exempt from a permit under the regulations, and it is worth checking this in advance.
5. Consultant coordination
Alongside the architect, the design may involve, as needed, a structural engineer, electrical, plumbing and HVAC consultants, lighting consultants, landscape architects and other consultants. Coordination between them ensures a complete design, and the practice leads the coordination with the consultants throughout.
6. Construction drawings and details
The construction drawings and details are the documents according to which the contractor builds. This is also where the joinery, lighting and material details are designed, and in projects where architecture and interior design are planned together, they are coordinated in advance with the infrastructure.
7. Construction supervision
Architectural supervision on the building site makes it possible to ensure that the design is translated correctly into construction, to review material samples and to respond to decisions that arise during the work.
By project type
In a new build, the process goes through all the stages, as detailed on the Designing a New House page. In a new apartment under construction, the process focuses on the plan of changes with the developer, see Tenant Modifications in New-Build Apartments. In public and commercial spaces, the work is carried out alongside the building architect and the project manager, see Public Building Architecture. For questions about a specific project: Contact.
Frequently asked questions
Preliminary design determines the layout of the building and the division of spaces, while construction drawings detail how to actually build: dimensions, materials and construction details.
No. Some works are exempt from a permit under the regulations, and some changes require a permit. It is worth checking this in advance with the architect and the local authority.
The applicant’s designer, usually the architect, prepares the drawings and documents and submits them to the local committee on behalf of the property owners.
As needed: a structural engineer, electrical, plumbing and HVAC consultants, lighting consultants, landscape architects and other consultants.